|
|
Research Associate (Arch) - Fixed Term Contract
The need to decarbonise society is becoming critical. This includes the built environment. This post is part of a very large grant of £36m made by the UK into designing and constructing buildings which produce more energy than they use. These next generation buildings are now starting to be built as demonstrators, yet it remains unknown if they can become the norm, what the limits are or what might be the best architecture and construction? This post will examine these limits from both a technical angle and a social/economic one. You will be required to carry out and economic analysis of the situation, hold focus groups and complete social surveys); discover the limits, then write a series of high quality journal papers. You will be joining a large team of researchers across the UK and the EDEn research group at Bath.
This post is one of two full time Research Associate roles for the Active Buildings Centre (ABC) and is being offered on a fixed term contract basis with an anticipated expiry date of 02 March 2022.
Any informal enquiries about this position and CT6567 can be directed to Professor David Coley via e-mail [email protected]
Categories: None
The words you entered did not match the given text. Please try again.
Oops!
Oops, you forgot something.